Categories | Exploration Drilling Rig |
---|---|
Brand Name: | Aoxing |
Model Number: | QYD-400 |
Certification: | ISO9001 |
Place of Origin: | Hebei,China |
MOQ: | 1 Set |
Supply Ability: | 30 Sets/Month |
Packaging Details: | in New Strong Plywood Case |
Model NO: | 400Type |
Condition: | New |
Drill Hole Diameter: | 50-300mm |
Drill Hole Depth: | 400m |
Bit Type: | Diamond Bit |
Drilling Way: | Rotary |
After-sales Service: | Provide Train Video or Remote |
Warranty: | Main Parts Within Six Months |
Portable Crawler Geological Diesel Engine Mining Rock Core Drilling Rig Machine
Full hydraulic core exploration drilling rig uses and advantages
1. This full hydraulic core exploration drilling rig using for
prospecting, gold ore, iron ore, coal, lithium ore, rubidium ore,
stone ore, etc.
Parameters of QYD-400 fully hydraulic core exploration drilling rig
Drilling rig model | QYD-400 | |
Drilling capacity | BTW (m) | 500 |
NTW (m) | 400 | |
HTW (m) | 180 | |
PQ (m) | / | |
Hydraulic system | Rated pressure (MPA) | 21 |
Cooling mode | Primary air cooling Primary water cooling | |
Engine | Engine type | Yuchai four cylinders |
Rated power (Kw) | 78 | |
Power Head | Maximum torque (N.m) | 500 |
Maximum rotating speed (rpm) | 1300 | |
Feeding Stroke (m) | 1.9 | |
Lifting force (kN) | 120 | |
Propulsion force (kN) | 60 | |
Wire-line coring winch | Rope capacity (m) | 500 |
Lifting force (kN) | 5 | |
Lifting speed (m/min) | 110 | |
Touchdown integrated drill tower | Full height (m) | 4.5 |
Drilling angle (°) | 45-90 | |
Slip stroke (mm) | 700 | |
Crawler chassis | Walking mode | Manual + Remote control |
Transport size | L*W*H (m) | 4*1.9*1.8 |
Whole machine weight | T | 4.3 |
Note: The product is continuously improved, and subject to change without notice, please refer to the actual product.
Maintenance and upkeep of drilling rigs
The maintenance and upkeep of drilling rigs are key to ensuring
their normal operation and extending their service life. Regular
inspection and replacement of lubricating oil are important steps
in maintaining the drilling rig, as it requires a large amount of
lubricating oil during operation. According to the frequency of use
and working conditions of the drilling rig, a suitable plan for
replacing lubricating oil can be formulated, and the replacement
cycle specified by the manufacturer should be strictly followed for
operation. In addition, cleaning and lubricating the chain is also
essential because the chain bears a huge workload, and regular
maintenance can ensure its normal operation and extend its service
life. 1
The maintenance of the drilling rig also includes regular
inspection and replacement of filters, inspection of electrical
systems, inspection of cutting tools and drill bits, cleaning of
the exterior of the drilling rig, and maintenance of the cooling
system. The filters in the hydraulic and air systems need to be
regularly inspected and replaced to maintain the cleanliness and
performance of the system. The inspection of the electrical system
ensures the normal operation and safety of the circuit, while the
regular inspection and replacement of cutting tools and drill bits
are related to the working quality of the drilling rig. Cleaning
the external surface of the drilling rig can prevent damage from
dust and corrosive substances, while regular inspection and
maintenance of the cooling system can help maintain the normal
operating temperature of the drill bit and tools.
Following operating procedures is a prerequisite for ensuring the
normal and safe operation of the drilling rig. Operators should
receive professional training and operate the drilling rig
according to the requirements in the operation manual to ensure its
safe operation.
![]() |