Categories | Ceiling Roll Forming Machine |
---|---|
Brand Name: | Saibo |
Certification: | CE/ISO |
Place of Origin: | China |
MOQ: | 1 set |
Price: | negotiation |
Payment Terms: | T/T, L/C |
Supply Ability: | 300 sets per year |
Delivery Time: | 70 working days after received deposit |
Packaging Details: | Suitable for ocean shipment |
Product Name: | Stud Panel Roll Forming Machine |
Power: | 7.5KW+5.5kw |
Steel thickness: | 1.4mm |
Decoiler: | Manual or hydraulic |
Station: | 16 stations + one station for rectify |
Roller material: | Gcr15 |
Structure: | Steel plate welding |
Drive: | By chain |
1. Specification of the material
1 | Suitable Material | Galvanized steel |
2 | Width of the raw material | Acording to the final profile |
3 | Thickness | 1.4mm |
2. Machine Detailed Parameters
1 | Roll Forming | Steel stud roll forming machine |
2 | Machine structure | Wire-electrode cutting structure |
3 | Total power | Motor power-7.5kw Hydraulic power-5.5kw |
4 | Roller stations | bout 18 stations + one station for rectify > |
5 | Productivity | 0-15m/min |
6 | Drive system | By chain |
7 | Diameter of shaft | ¢70mm solid shaft |
8 | Voltage | Customized |
9 | Color Of The Machine | Yellow and blue |
10 | Deliver Time | 70 days |
11 | Terms Of Payment | 30%T/T 70% pay before shipment |
3. Profile drawing
4. The Chart of Process Flow
5. Specification of Components
(1) 3T Manual Un-coiler
(2) Main Roll Forming Machine
(3) Hydraulic cutting system
(4) Computer Control Cabinet
6. Warranty
1: Guaranteed against malfunctions due to manufacturing defects for 1 year after date of shipment. Repairs will be made free of charge.
2: Repairs will not be performed free of change even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
3:Air ticket, transportation cost, hotel, meals and 100$ per day shall be for purchaser’s account if manufacturer’s engineer has to be send to purchaser’s factory to maintain the machine during the guarantee period.
![]() |