Home > Air Cleaners >

CFB 110 MW Boiler Water Wall Panels For High Temperature Solid Fuel Boiler

Categories Water Wall Panels
Brand Name: ORL Power
Model Number: Customization
Certification: ISO9001/SGS/TUV/ASME/EN
Place of Origin: Zhangjiagang,Jiangsu,China
MOQ: 1 Set/Sets 10tons
Price: Contact me | Get Latest Price
Payment Terms: T/T
Supply Ability: 500Ton/Tons per Month
Delivery Time: 50~100 Days
Packaging Details: Iron Frame Package
Thickness: 9mm, 11mm, 13mm
Material: Wood Plastic Composite
Application: High Temperature Solid Fuel Boiler
Structure: Fire/Water Tube
Pressure: High/Low Pressure
Style: CFB boiler
Fuel: Coal/Gas/Oil-fired, Water Heat
Output: Hot Water/Steam
Place of Origin:: Zhangjiagang,Jiangsu,China
Weight: 10~1000ton
Keywords: Boiler Water Wall Panels
  • Product Details
  • Company Profile

CFB 110 MW Boiler Water Wall Panels For High Temperature Solid Fuel Boiler


CFB 110 MW Boiler High Temperature Solid Fuel Boiler Chemical Natural Oil Industry Plant Waterwall Panel TUV

Description

A waterwall in a boiler is any furnace wall that is comprised of refractory and tubes in a water-tube boiler. The tubes are evenly spaced and generally connect to headers which in turn are connected back to the main generating bank of the boiler. They serve a two fold purpose here in that they capture heat that would otherwise escape to the atmosphere and help heat the water in the boiler. And they also help keep the refractory cool .This prevents spalling of the refractory.

Our membrane water wall are manufactured with high grade raw material and contemporary production equipment at our advanced production unit. Various sizes, shapes and specifications, will meet all the requirements of our clients . Further, cargoes are delivered to the clients within lead time.

Specifications

NameMembrane water panel
MaterialCarbon steel,Alloy steel,etc.
Tube sizeΦ38 - 76 mm, Customization
StandardISO , ASME
ModelStudded
DimensionCustomization
Manufacturing processMaterial→Ingot → Hot/Cold-Rolling→ Heat treatment (Normalizing+ tempering) → Inspection →Polishing→Tube joint welding→Assembly →Welding →Inspection→Heat treatment→Hydraulic pressure test→Painting→ Packaging
Installation locationaround the boiler combustion chamber

Advantages

1). To guarantee the leakproofness of furnace wall and reduce the air leak of combustion chamber.
2). To achieve the full water cooling of combustion chamber, and the boiler accessories membrane water wall is benefit to prevent coking under the condition of supplemental firing.
3). The thermal storage capacity is small, the warming of combustion chamber is fast and the cooling is also fast, which could shorten the cooling time of boiler’s start and furnace shut down.
4). It is good to adopt top supported water cooled wall and it could reduce the load of boiler framework, which is benefit to overhang.
5) Compared with the bare tubes, the membrane water wall improves the heat absorption capacity of tubes.
6) The factory direct boiler membrane water wall could improve the Preliminary combination degree of boiler parts and reduce the installation workload.

Company Information

Suzhou ORL Power Engineering Co., Ltd.is located in Suzhou, Jiangsu Province.

ORL Power is a leading company and exporter of industrial boilers,power plant boilersand boiler parts (including steam drum, membrane waterwall panel,header,economizer, evaporator, superheater,H-fin economizer, spiral fin tube, air preheater, heat pipe, flue etc.), seamless steel tubes/pipes and ERW steel pipes.ORL provides our customer with full range of services including boiler design, fabrication, installation and commissioning, boiler maintenance, and supervision at site. Our product and service include design and manufacture industrial boilers, pressure vessels and tanks, and pressure parts for power plant boilers (600MW, or 1000MW).

Boiler Parts

Boiler Super Heater,Boiler High Temp Superheater,Boiler Cyclone Separator,Boiler Flue,Boiler Heat Pipe Air Preheater,Boiler Gen Bank,Boiler Heat Pipe Elements,Boiler Tube Pin,Boiler Tubeshield,Boiler Ditch Tube


Boiler Product Production

Boiler Cyclone Separator WorkShop, Boiler Coil Workshop, Boiler Waterwall Workshop.


Boiler Product Test

Impact test,The scene to examine the water-wall,Industrial TV monitoring,Snake-like pipe water pressure test,Header endoscopic detection,Header weld inspection

Packing&Shipping


Certifications



Company Business


Trading Process

FAQ


1. Why choose us?

We are boiler and boiler parts(boiler drum, boiler waterwall panel, boiler economizer, boiler header, boiler cyclone separator, boiler flue pipe, boiler air preheater, boiler pipe, boiler tube)manufacture and we are one of the best suppliers in China.

We ensure the deliver time, high quality, and the best after-sale service for you.

2. How to order?
Welcome come to our factory for inspecting and discussion the technical details.


Contacts

ADD:No 11, East Renmin Road, Zhangjiagang City, Jaingsu,China

Website: www. boiler-units.com

Email: info@orlpower.com

Tel: 86-051256770166

Product Tags:

boiler water tube

  

boiler panel

  
Cheap CFB 110 MW Boiler Water Wall Panels For High Temperature Solid Fuel Boiler for sale
Send your message to this supplier
 
*From:
*To: Suzhou orl power engineering co ., ltd
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
  • Submit Buying Request
    Contact Us Quickly