Categories | Sliding Gate Motor |
---|---|
Brand Name: | WEJOIN |
Model Number: | WJMP202 |
Certification: | CE,ISO,SGS |
Place of Origin: | SHENZHEN |
MOQ: | 1 SET |
Price: | USD 150-200 SET |
Payment Terms: | T/T, Western Union |
Supply Ability: | 10000 set / month |
Packaging Details: | Carton |
Material: | Aluminum alloy die-cast |
Environment temperature: | -25°C ~ +55°C |
Limit switch: | Magnetic limit switch or Spring limit switch |
Voltage: | 110 V |
Name: | Sliding Gate Operator |
Usage: | Villa Gate |
1800kg ac control board electric gate motors for sliding door
Main Features
AC motor with built-in control unit
Keypad/single button interface
Alarm lamp, photo beam and safety beam interface
User can select auto-close function
Soft start and slow stop(smart version, optional)
Auto-reverse function when hitting obstacle during closing(smart
version, optional)
Manual key release design for emergency power failure
Specifications
Model | WJKMP202 | |
Voltage | 220V±10% | 110V±10% |
Frequency | 50HZ | 60HZ |
Current | 2.7A | 5.8A |
Motor voltage | AC220V / 110V | |
Capacitor | 20μf | 60μf +14μf |
Output Power | 350W | |
Absorbed power | 594W | 638W |
Motor base and it's installation
1. Motor base installation: set the installation position of the
base tray according to the size of the motor and the height of the
installation position of the gear rack. Then Embed the bolts in
advanced or use the expansion bolts to embed the base into the
cement foundation.
2. If the gear rack has already been installed, fix the motor to th
base and turn the clutch with the clutch key to the off position,
then make the gear of the motor suit right to the gear rack, then
the position of the base can be set. Take off the motor and fix the
base.
Rack installation
Make the gear of the gear rack towards the floor. Make the gear of
the rack fit the gear of the motor. Fasten the gear rack to the
door with the screws. Push the gate and make it move the whole
route Fasten the gear to the gate after assuring that the gate run
smoothly the whole route
Rack is usually installed piece after piece. To avoid dithering or
blocking, please adjust the gap of the gear rack. We suggest one
way( refer to Fig-3): fix up the rack1 and rack after adjusting the
two racks with the small adjusting rack
![]() |