Categories | Cryogenic Tank |
---|---|
Brand Name: | heze boiler factory |
Model Number: | CFL-30/2.16 |
Certification: | ISO14001/ISO9001 |
Place of Origin: | China |
MOQ: | 1 piece cryogenic vacuum CO2 storage tank |
Supply Ability: | 150 PIECE/MONTHS |
Delivery Time: | 30m3 vertical CO2 storage tank will be ready about 30 days after receipt of the deposit |
Packaging Details: | one piece 30m3 CO2 tank should load in one 40ft flat rack container |
LCO2 tank volume: | 30m3 |
Materials of LCO2 storage tank: | Q345R and 16MnDR |
Color of tank: | White Jotun Paint imported from USD |
Volume Available: | 10m3 to 150m3 capacity tank |
HEZE BOILER FACTORY CO.,LTD is the professional manufacturer for lpg tank, cryogenic vacuum powder insulated storage tank, mainly including cryogenic liquid CO2 Tank,liquid Oxygen Tank,liquid Argon Tank,liquid nitrogen tank,LNG Tank with different capacity from 5m3 to 150m3.
liquid CO2 tank to serve for the welding machines
Carbon dioxide storage tank, low temperature liquid carbon dioxide storage tank, the structure of LCO2 tank is composed of double containers inside and outside the container, vacuum powder adiabatic type, can be divided into two types of vertical and horizontal, the inner material 16MnDR, the outer container material according to the user area Select Q235-B or Q345, inside and outside the container sandwich filled with insulating material pearl sand and vacuum.
Safety technology features
Cryogenic liquid carbon dioxide storage tank with "combination, safety system valve" using two sets of safety valve at the same time, in the safety valve periodic check can be closed side, the other side to continue to work to ensure the safe operation of the tank.
operating system
The upper part of the tank is equipped with a pressure gauge, differential pressure level gauge and liquid level table, you can always grasp the internal storage capacity and pressure changes, easy to fill and discharge operation.
Detection Systems
The bottom of the tank is equipped with a special tank vacuum detection, vacuum regulation and vacuum valve can be regularly or at any time with a vacuum gauge to detect the sandwich vacuum to ensure the safe operation of the tank.
Technical parameters for 30M3 Cryogenic Vacuum Vertical CO2 Tank
Liquid CO2 Storage Tank Technical Parameter | |
Model | CFL-30/2.16 |
Full Capacity | 31.58M3 |
Rated filling rate | 0.95 |
Valid capacity | 30 M3 |
Medium | LCO2 |
Design pressure | 2.2MPa |
Working pressure | 2.16MPa |
Max. Allowance working pressure | 2.27MPa |
Liner materials | 16MnDR |
Shell materials | Q345R carbon steel |
Weight in theory(kg) | 18600 |
Size(mm) | Φ2920*8910 |
Design using life | 20 years |
Remark: The mentioned parameters of LCO2 tank is subject to the drawing. |
Related rules & standards for Cryogenic Vacuum Pressure Tank
1.TSG 21-2016< Fixed rules of the safety technique pressure vessels>
2.GB150.1~150.4-2011< Pressure vessels>
3.NB/T47014-2011 <Pressure equipment welding procedure qualification>
4.NB/T47015-2011 <Pressure vessel welding procedure specification>
5.GB/T25198-2010 < Pressure vessel head>
6.JB/T4730-2005 <Pressure equipment nondestructive testing>
7.NB/T47016-2011 <Pressure equipment product welding specimen mechanics performance test>
8.JB/T4711-2003 < Pressure equipment coating packing and shipping>
9.GB/T18442.1-18442.6-2011 < Stationary vacuum insulated cryogenic pressure vessels>
Inspection, test and acceptance of Cryogenic Storage Tank
1.After inspection of inner cylinder material to make sure it is qualified, and then put into use.
2.Check all weld joint according to GB150.1~150.4-2011 standard, after inspection passed, A and B type weld joint need 100% ray test, C and D type weld joint 100% dye test and issue the test report.
3.After installation of the shell, there will be a test according to GB150.1~150.4-2011 standard for checking of geometric dimension, nozzle orientation and shape deviation.
4.Inspection after pressure test and pressure test report issued, after pressure test of pumping air into vacuum state, after vacuum degree requirements helium leak test.
5.After interlayer leak detection qualified fill perlite in vacuum, vacuum degree meet the requirements of GB/T18442-2011 standard then sealed-off vacuum degree.
6.After tank manufacturing has been completed, the seller notify the buyer to the seller's site for pre-acceptance, acceptance of the project including tank vacuum degree index, the valve instrument configuration, exterior paint quality, whether the factory documents is complete, after the acceptance of the buyer, the seller can deliver goods after signed by both sides.
Contact Way
Heze Boiler Factory Co.,LTD
Email: glhz01@163.com
Skype: yuan.sunny1
Wechat:+86-155-6278-7985
Whatsapp:+86-157-5300-0325
Tel: +86-0530-735-5392
Mobile:+86-157-5300-0325
Address: No.2218 Ji'nan road Evelopment Zone Heze City Shan dong Province China
Photos for refer as below:
![]() |