Home > Paper Chemicals >

7.5kw Pre Engineering Building Forming Machine , 18 Stations Gutter Roll Forming Machine

Categories Pre Engineering Building Forming Machine
Brand Name: Saibo
Model Number: Gutter roll forming machine
Certification: CE/IS09001/SGS
Place of Origin: China
MOQ: 1 set
Price: negotiable
Payment Terms: L/C, T/T, Western Union
Supply Ability: 410 sets per year
Delivery Time: 50 working days after received deposit
Packaging Details: Suitable for ocean shipment
Shaft: ¢70mm silid shaft
Steel thickness: 0.4-0.6mm
Main power: 7.5KW
Roller material: SAE1045 steel with chrome
Station: 18 stations
Cutter material: Cr12
Voltage: 440V, 60HZ, 3Phase
  • Product Details
  • Company Profile

7.5kw Pre Engineering Building Forming Machine , 18 Stations Gutter Roll Forming Machine

7.5kw main power Pre engineering buliding forming machine 18stations G550


Gutter Roll Forming Machine


Profile:


Layout:

Manual de-coiler—Pre-cutting—Feeding—Roll Forming—Cutting—Out table


Specifications:


Description


Offered specification

Roll Forming Machine

Gutter roll forming machine


Rolling Speed20m/min
Rolling Thickness0.4-0.6mm Color steel, G275-G550
Un Coiler3T manual or hydraulic decoiler
Roller StationsAbout 18 stations (according the final design)
Roller Material45# forge steel, coated with chrome
Shaft Material and DIA¢70mm, material is 45# forge steel
Post cuttingHydraulic cutting after forming
Maim Motor Power7.5kw
Hydraulic Station Power5.5kw
Hydraulic Pressure10-12Mpa adjustable
Material Of CuttingCr12,quenching 58-62℃
Structure Of The StationsWall panel
Tolerance3m+-1.5mm
Electric Source

440V, 60HZ,3 phase

According to customer’s require


Way Of DriveBy chain
Color Of The MachineYellow and blue

Warranty

  • Warranty: 1 year warranty from date of shipment
  • Guarantee:

1: Guaranteed against malfunctions due to manufacturing defects for 1 year after date of shipment. Repairs will be made free of charge.

2: Repairs will not be performed free of change even during the guarantee period in the follow circumstances

- Damage occurs due to a natural disaster

- Malfunction occurs due to user error

- Malfunction occurs due to modifications

- Malfunction occurs due to further movement or shipment after installation

3:Air ticket, transportation cost, hotel, meals and 80$ per day shall be for purchaser’s account if manufacturer’s engineer has to be send to purchaser’s factory to maintain the machine during the guarantee period.


Installation and training

a. If buyers visit our factory and check the machine, we will teach you how to install and use the machine, and also train your workers/technician face to face.

b. Without visiting, we will send you user manual and video to teach you to install and operate.

C. If buyer needs our technician to go to your local factory, please arrange board and lodging and other necessary things.


Cheap 7.5kw Pre Engineering Building Forming Machine , 18 Stations Gutter Roll Forming Machine for sale
Send your message to this supplier
 
*From:
*To: Zhangjiagang City Saibo Science & Technology Co.,Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)
 
You may also be interested in :
Inquiry Cart 0
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
  • Submit Buying Request
    More from this Supplier
    Contact Us Quickly